Floor
One piece metal
underbelly aides in prevention of corrosion and rodents.
2X6 Floor joists run horizontal
allowing the duct work to run to the edge of the floor. This allows
the registers to be placed against the wall.
Roof
Roof Rafters are placed
at 16" on center |